1. Home
  2. Industries
  3. Electrical

Electrical contractors commercial jobs · crews moved mid-week · foremen

Time tracking for electrical crews, project by project

An electrical contractor runs several jobs at once and moves journeymen between them as each one waits on inspections or other trades. GEOTT records every clock-in on the project it belongs to, checks it against that project's geofence, and lets each foreman approve the hours on their own job without seeing the rest.

$7 per active worker a month · foremen with rights on their own job · 15-day trial, no card

Electricians working on wiring in a commercial building under construction
Inside a building under construction GPS is weaker: crews clock in at the gate, the circle covers the whole site.

Why do electrical contractors lose track of hours per job?

Because crews move. A journeyman starts Monday on a school, spends Tuesday on a tenant fit-out while the school waits on drywall, and returns Wednesday. If the timesheet is written once a week, those moves get averaged out, and the job-cost report shows the bid, not the job. GEOTT records each move when it happens.

Where hours go missing, and what GEOTT changes
Where hours go missingWhat GEOTT changes
Crew moved to another project for half a daySite change on arrival, checked against the new project's circle
Foreman fills in the crew's hours from memoryEach worker punches on their own phone; the foreman reviews
Time at the supply house counted on the jobA punch outside the project's circle is refused or flagged
Overtime discovered on paydayWeekly view with expected hours and overtime after 40 hours, live

Can foremen manage hours without seeing everything?

Yes. Make the foreman a project manager on their jobs and give rights area by area: hours (view, approve, correct), documents and crew messages. They see the punches, flags and reports of their projects only. The office keeps the full picture, and every correction stays in the change log with a reason.

  • Approve on site. Out-of-area punches and missed punches land with the foreman of that job.
  • Files with the job. Drawings or schedules up to 10 MB stored on the project.
  • Messages to the crew. Short notes with a push notification, to that job's crew only.

What do hours per job look like at month-end?

Below is a sample month with invented projects for a contractor with 8 electricians. The by-project Excel export lists each job with the hours of every worker who touched it: 1,312 hours across four jobs, and the shop. That is the figure to compare with each bid before the next one is priced.

Sample data: 8 electricians, one month
Project (sample)WorkersHoursNote
Elementary school renovation6620Paused 3 days for inspection
Medical office fit-out4380Crew moved in while the school waited
Warehouse lighting retrofit3216Night work, night rule applied
Restaurant service upgrade264Basement panel, punches synced later
Shop832Loading and prep

GEOTT gives the hours, not dollars: labor cost and invoicing stay in your accounting. The four exports are described on the features page.

How accurate is GPS on a building going up?

Outside, usually good: GPS.gov puts smartphones within about 4.9 m (16 ft) under open sky. Inside a structure with steel and concrete, accuracy drops. That's why the circle should cover the whole site plus a margin, and crews should clock in at the gate or trailer.

GEOTT suggests a radius and flags after the first week if honest punches land outside. More on geofence time tracking.

Starting points for electrical work
ProjectSuggested radius
Tenant fit-out in a mall or tower100 m (about 330 ft)
School or clinic renovation200 m (about 660 ft)
Warehouse or industrial site300 m (about 985 ft)
Solar or utility site800 m (about 2,620 ft)

How much does GEOTT cost for an electrical contractor?

$7 per active worker per month: 8 electricians who all clocked in cost $56. Foremen count only if they clock in themselves; office staff, estimators and admins are free. No base fee, no charge per project, no hardware, and the trial runs 15 days without a card.

How the monthly count works: GEOTT pricing. How a site goes from setup to month-end: how GEOTT works.

Electrical contractor questions

What is the best time tracking app for electrical contractors?

One that keeps hours per project when crews move mid-week, gives foremen rights on their own jobs only, and works inside buildings with weak signal. GEOTT does those for $7 per active worker. It doesn't estimate, invoice or do payroll.

Can I see overtime before payday?

Yes. The weekly view shows expected hours, worked hours and the difference per person, live. For US companies, hours over 40 in the workweek count as overtime automatically, and you can add daily thresholds. Each total comes with a step-by-step explanation.

How do I stop clock-ins from the supply house?

Keep "clock in anyway" off for that project: a punch outside the circle then doesn't go through. If you'd rather not block anyone, turn it on and every out-of-area punch arrives flagged, with the distance, for the foreman to approve or reject.

Do I need to tell my electricians about GPS clock-in?

Yes, and in some states it's required in writing. GEOTT shows each worker a notice to confirm before the first punch. The rules by state are in is GPS tracking of employees legal?

Which other crews use GEOTT?

Any company whose people start the day on a job site instead of in an office. Each page takes one trade, its typical day and the radius that fits its sites.

How do I test GEOTT on my electrical jobs?

Set up the two projects your crews move between most, make the foreman a project manager on one of them and send the link. After a week, compare the hours per job with what you expected. The trial lasts 15 days, no card needed.